Five Reasons to Get the Contract Signed Before Construction Starts
In the Pacific Northwest, Mother Nature can play a large part in whether or not a construction project will be completed on time and on budget. The importance to both owners and contractors of starting a construction project in order to take advantage of a window of good weather or other factors can make finalizing…
Here’s what building owners need to know following last year’s wildfires, earthquakes
California’s 2018 wildfire season — the most damaging and deadly on record — and a pair of earthquakes in Alaska can serve as case studies for Northwest property owners as to steps they can take to mitigate their risks in the event such disasters strike closer to home. In my latest article for the Seattle…
Update on Alaska Way Viaduct Replacement
Occasional visitors to Seattle may be surprised to discover that their favorite route from the airport to downtown has changed. State Highway 99 no longer links to the Alaskan Way Viaduct into downtown Seattle. The waterfront viaduct has been closed and demolition has begun. The Battery Street tunnel that connected viaduct traffic to Aurora Avenue…
Reimagining the Dispute Resolution Provision in Construction and Design Contracts
In construction projects, experienced owners, contractors, or designers know that disputes will almost invariably arise — even when the parties have the best of intentions. And they understand that detailed contract provisions to resolve those disputes can have major benefits if they are properly drafted to suit the project, parties, and types of dispute most…
Reminder of January 1, 2019 Mandatory New Notice Requirement by CA Residential Solar Contractors

In 2017, the California Legislature passed a bill that resulted in Business and Professions Code (BPC) section 7169, which ultimately would require Home Improvement Contractors, which include contractors that install solar systems on residences, to issue specific disclosures to any residential consumers who may want to purchase, finance or lease, and install a solar system on their property. Recently in August, the California Public Utilities Commission “endorse[d] the solar energy systems disclosure document as being compliant with [BPC section 7169]….” The Disclosure terms include:
- The total cost for the solar system, including financing and energy/power costs (if applicable);
- The statutory License Board Disclosure statement for contractors and / or the home improvement salesperson who sold the system information regarding with whom to file if there are complaints; and
- The statutory Three-Day Right to Cancel Disclosure if the contract is not negotiated at the contractor’s place of business.
“Is Mike M. Johnson Here to Stay?”—Recent Washington Supreme Court Case Upholds Contractual Waiver of Claims Provision
In Nova Contracting, Inc. v. City of Olympia, No. 94711-2 (Wash. Sept. 29, 2018), the Washington Supreme Court, sitting en banc, ruled in favor of a municipality on the issue of whether the general contractor complied with a contract’s notice of claim provision. Relying on Mike M. Johnson, Inc. v. Spokane County, 150 Wn.2d 375, 78 P.3d 161 (2003), the court in Nova Contracting held that a broad notice of claim provision (waiving “any claims” for noncompliance) (a) mandates written, rather than actual, notice of claims and (b) applies not only to claims for cost of work performed, but also to claims for (i) expectancy and consequential damages and (ii) breach of the covenant of good faith and fair dealing. Slip op. at 2-3, 15.
The case arose from certain disputes between the City of Olympia (the “City”) and a contractor (“NOVA”) in connection with a public works contract in which the contractor agreed to replace an aging cement culvert. The contract contained a “notice of protest” provision from the Washington State Department of Transportation’s standard specifications. This provision required the contractor to “‘give a signed written notice of protest’ ‘[i]mmediately’ if it ‘disagree[d] with anything required in a change order, another written order, or an oral order from the [City] Engineer, including any direction, instruction, interpretation, or determination by the Engineer.’” Id. at 1-2.
Developers and Builders Gain Time from Permit Expiration in California with AB 2913
After decades of dealing with a hodgepodge of local adoption (or not) of administrative codes relating to building permit extensions, California Governor Brown’s September 21, 2018 signature on AB 2913 is a welcome addition of at least six months to the existing statutory commencement of work period. AB 2913 allows a uniform 12-month period across…
The Owner’s Guide to Negotiating Construction Contracts During Volatile Trade Negotiations
President Trump’s new tariffs and ongoing trade negotiations concerning building commodities like steel, aluminum, and lumber have resulted in uncertain market conditions for those in the construction industry, making it nearly impossible for owners, developers, contractors, and suppliers to accurately analyze and allocate risks during construction contract negotiations. In my latest article for the Daily…
Legislative Update: House Bill 4154
In February 2018, the Oregon Legislature attempted to push through House Bill 4154, which would have made a general contractor liable for unpaid wages, including benefit payments and contributions, of an employee of a subcontractor at any tier, after that employee files a wage claim and the Commissioner of the Bureau of Labor and Industries…