Occasional visitors to Seattle may be surprised to discover that their favorite route from the airport to downtown has changed. State Highway 99 no longer links to the Alaskan Way Viaduct into downtown Seattle.  The waterfront viaduct has been closed and demolition has begun.  The Battery Street tunnel that connected viaduct traffic to Aurora Avenue

In construction projects, experienced owners, contractors, or designers know that disputes will almost invariably arise — even when the parties have the best of intentions. And they understand that detailed contract provisions to resolve those disputes can have major benefits if they are properly drafted to suit the project, parties, and types of dispute most

In 2017, the California Legislature passed a bill that resulted in Business and Professions Code (BPC) section 7169, which ultimately would require Home Improvement Contractors, which include contractors that install solar systems on residences, to issue specific disclosures to any residential consumers who may want to purchase, finance or lease, and install a solar system on their property. Recently in August, the California Public Utilities Commission “endorse[d] the solar energy systems disclosure document as being compliant with [BPC section 7169]….” The Disclosure terms include:

  • The total cost for the solar system, including financing and energy/power costs (if applicable);
  • The statutory License Board Disclosure statement for contractors and / or the home improvement salesperson who sold the system information regarding with whom to file if there are complaints; and
  • The statutory Three-Day Right to Cancel Disclosure if the contract is not negotiated at the contractor’s place of business.

In Nova Contracting, Inc. v. City of Olympia, No. 94711-2 (Wash. Sept. 29, 2018), the Washington Supreme Court, sitting en banc, ruled in favor of a municipality on the issue of whether the general contractor complied with a contract’s notice of claim provision.  Relying on Mike M. Johnson, Inc. v. Spokane County, 150 Wn.2d 375, 78 P.3d 161 (2003), the court in Nova Contracting held that a broad notice of claim provision (waiving “any claims” for noncompliance) (a) mandates written, rather than actual, notice of claims and (b) applies not only to claims for cost of work performed, but also to claims for (i) expectancy and consequential damages and (ii) breach of the covenant of good faith and fair dealing.  Slip op. at 2-3, 15.

The case arose from certain disputes between the City of Olympia (the “City”) and a contractor (“NOVA”) in connection with a public works contract in which the contractor agreed to replace an aging cement culvert. The contract contained a “notice of protest” provision from the Washington State Department of Transportation’s standard specifications.  This provision required the contractor to “‘give a signed written notice of protest’ ‘[i]mmediately’ if it ‘disagree[d] with anything required in a change order, another written order, or an oral order from the [City] Engineer, including any direction, instruction, interpretation, or determination by the Engineer.’” Id. at 1-2.

After decades of dealing with a hodgepodge of local adoption (or not) of administrative codes relating to building permit extensions, California Governor Brown’s September 21, 2018 signature on AB 2913 is a welcome addition of at least six months to the existing statutory commencement of work period. AB 2913 allows a uniform 12-month period across

President Trump’s new tariffs and ongoing trade negotiations concerning building commodities like steel, aluminum, and lumber have resulted in uncertain market conditions for those in the construction industry, making it nearly impossible for owners, developers, contractors, and suppliers to accurately analyze and allocate risks during construction contract negotiations. In my latest article for the Daily

In February 2018, the Oregon Legislature attempted to push through House Bill 4154, which would have made a general contractor liable for unpaid wages, including benefit payments and contributions, of an employee of a subcontractor at any tier, after that employee files a wage claim and the Commissioner of the Bureau of Labor and Industries