The roles of designers and contractors are being combined for more and more construction projects, an approach that comes with both benefits and risks. Several methods of project delivery are commonly in use, none of which is entirely exclusive — different projects may include different and overlapping roles for owner, designer and contractor. In my
Design Build Agreements
Design-Build Lite – Construction Contracts with D-B Components
For most in the industry, when we think about a standard construction contract, we envision the construction documents being drafted by the architect and other design consultants. We tend to view the project as design-price-build, unless an alternative procurement mechanism has been selected such as design-build. Consistent with this design-price-build model, the contractor’s review of…
Design-Build and EPC Contracting Approaches Under Fire by Contractors
In a recent article in the ABA’s “Under Construction” publication (link here) the author describes a trend among some major contractors, including SNC-Lavalin, Fluor Corporation and Granite Construction, to leave the DB and EPC space. Other large contractors have announced similar intentions. The problem appears to be that the DB and EPC delivery methods…
Update on Alaska Way Viaduct Replacement
Occasional visitors to Seattle may be surprised to discover that their favorite route from the airport to downtown has changed. State Highway 99 no longer links to the Alaskan Way Viaduct into downtown Seattle. The waterfront viaduct has been closed and demolition has begun. The Battery Street tunnel that connected viaduct traffic to Aurora Avenue…
Doing It Differently: Portland’s Plan to Redevelop the U.S. Post Office Site and Broadway Corridor
Portland real estate is booming and Portland is now on the map for many national and international developers for the first time. This success, while enviable, is not without some negative consequences, as evidenced by increasing housing costs and congestion.
As Portland anticipates the arrival of even more people, it is trying to figure out where to put those new arrivals and how to preserve and enhance quality of life for both new and existing residents. Large-scale City planning efforts such as the 2012 Portland Plan and 2017 Comprehensive Plan reflect a recognition that not everyone has enjoyed the benefits of past prosperity and public investment, and that the City will seek to be more intentional and inclusive going forward.
An emerging redevelopment area offers an opportunity to try new things and develop differently this time. The Broadway Corridor redevelopment area is 24 acres located between the Pearl District and Old Town/Chinatown. The area is centrally located in downtown Portland, has freeway access and is served both by Amtrak, via historic Union Station, and by TriMet’s light rail. The “pearl” of this redevelopment area is the 14-acre U.S. Post Office site, bordered by NW 9th Avenue, NW Hoyt Street, NW Broadway and NW Lovejoy and purchased by the City of Portland in 2016.
The City purchased the Post Office site for almost $90,000,000 and understandably is carefully shepherding this public investment. The City’s Broadway Corridor Framework Plan provides a conceptual “framework” for future development of a 24-acre area including the Post Office site, but actual development will require a new type of public-private partnership and substantial further refinement of the plan, with the City committed to recovering its financial investment.
Design-Build Certification
One should never stop learning, so next week I will attend a three-day seminar presented by the Design-Build Institute of America. If I complete the seminar and pass a test, I will become a Designated Design-Build Professional. The DBIA has an informative page about certification on its website.
In preparation for the seminar, I completed…
Negotiating by a Thousand Texts: LOL? Think Again.
The law may be slow to evolve, but courts are beginning to embrace 21st century communication methods. The prospect of negotiating a deal by text message may seem like a laughing matter, but a Massachusetts court recently relied on parties’ email and text communications to determine the essential elements of an agreement for the…
“From, For, and Against”: What’s the Difference?
Indemnity provisions are often among the most negotiated and least understood provisions of commercial contracts, and construction contracts are no exception to this rule. Despite, and perhaps because of, the importance of these clauses, they have evolved into an almost impenetrable jumble of legal terminology.
This jumble of words is not, however, without meaning. Although…
Termination Clauses a Must for Owners
The recent termination of the joint venture of Skanska-Hunt from the Washington State Convention Center project (article here) is a good reminder of the importance of well-written termination clauses in your owner-contractor contracts. The reasons for termination (or “severance,” a slightly kinder word) can be many, including failure to agree on pricing (the reason…
An Introduction to Design-Build for Public Project Delivery
Design-build is growing in popularity with public owners. But it presents challenges and potential pitfalls for the unwary. In my recent article for the Daily Journal of Commerce, I address some of those challenges and pitfalls and offer considerations that go into a successful design-build project. Read the full article here.
“An Introduction…