The Nevada Supreme Court has answered a question that developers and contractors have been asking for years:  can the statutory limitation period for a construction defect action be shortened?  The court answered in the affirmative but held that there must be no statute to the contrary and that the reduced limitation period must be reasonable

There are now 25 states in the U.S. that hold that construction defects are not an “occurrence” and are therefore not covered under commercial general liability policies insuring contractors.  Couple this troubling statistic with the ever increasing number of policy exclusions and limitations, and we begin to realize that in many situations the contractor’s insurance policy is inadequate (or non-existent) protection against defects. 

The importance of performance bonds as security to pay for construction defects is therefore growing.  While some sureties who sell the bonds will tell you that bonds merely guarantee completion, and do not insure against latent defects, the language of the typical bond defies this position.

 

Bonds plainly state that they guarantee each and every obligation of the contractor under the contract.  Those obligations usually include the duty to perform work according to the plans and specifications, the standard of care, and without defect or nonconformity.  This author has not seen a bond that attempts to carve out construction defects from its coverage.  And bonds do not have the host of exclusions or limited coverage grants that plague the value of insurance policies.  By the same token, bonds are not perfect and owners should consider the following to get the most protection from a bond:

 

First, the bond duration should extend at least as long as the warranty period (typically one year from completion but sometimes longer) and for as many years thereafter as possible, up to the statute of repose period in the state in which the project is located.  Because construction defects often appear years after completion, the bond duration is critical.  You may pay more for a bond with a longer duration, but if the bond is needed, you should be paying less for the unreliable insurance carried by the contractor.

 

Last month the Oregon Supreme Court heard oral argument in Abraham v. T. Henry Construction, Inc., a residential construction defect case.  Shortly after the Oregon Court of Appeals published its opinion in September 2009, Ahead of Schedule authors Eric Grasberger (“Negligence Claims Take Another Twist in Oregon” and Kip Childs (“Oregon

Today the Consumer Product Safety Commission recommended removal of all sulfur-containing drywall from homes built with the problem drywall. The CPSC’s recommendation is contained in its Interim Remediation Guidance for Homes with Corrosion from Problem Drywall. In addition to the problem drywall, the CPSC recommends removal and replacement of all fire safety alarm systems

Four Practical Points for Avoiding and Responding to Construction Liens

Step 1: Who’s healthy in 2010?

Within the bounds of the Fair Credit and Reporting Act and any state obligations, it is imperative for both owners and general contractors to understand the financial fortitude of the parties doing the work. If you don’t obtain the

Your project is coming along fine, despite the economy. You’ve weathered the squalls of bids, design changes, agency approval, and credit (mercifully), and now even construction completion is looking good. You can see the finish line through the haze on the horizon, and you’re fairly pleased with how you have pulled everything together with what

Just when you thought it was safe to go back into the water, the Oregon Court of Appeals strikes again with another iteration of the “economic loss doctrine” which defines when parties can sue each other in negligence for construction defects. In Abraham v. Henry (September 2, 2009) the Court held that parties to a

Oregon HB 2434, passed by the House of Representatives on May 4, 2009 and by the Senate on June 22, 2009, is currently awaiting the Governor’s approval or veto. The bill would reduce from 10 years to six years the maximum time period during which an owner of a "large commercial building" could assert claims

The Portland Business Journal  recently stated that Chinese drywall has been reported in Oregon. In addition, late last week the United States Consumer Product Safety Commission (“CPSC”) issued a status report on its investigation into the imported drywall. This report states that 5,503,694 sheets of Chinese drywall were imported into the United States during 2006