Commercial Construction Contracts

The party responding to a proposed design or construction contract may satisfy itself that the contract proposes arbitration or litigation to resolve any disputes and leave it at that—as long as the method of resolution is generally aligned with the party’s preferences. In order to eliminate surprises for their clients if a dispute arises and

The construction industry has proved adaptable over the course of the pandemic — owners and general and trade contractors have worked closely to ensure that work continued, while keeping workers safe and complying with the various government-ordered and -recommended practices intended to slow the spread of COVID-19. By now, most owners and contractors are well

In my latest column for the Daily Journal of Commerce, I look at the concept of liquidated damages – in my experience one of the top five heavily negotiated (and litigated) clauses in a construction contract. Because a project owner’s potential delay damages are often difficult to determine with certainty at the beginning of

Indemnity and additional insurance provisions in commercial construction contracts may no longer be an “arm’s-length” negotiation in California. Dramatic changes are proposed in sb 474 (2011). We most recently saw this type of legislative intrusion directing contract language in the residential construction context with the significant modifications of Civil Code section 2728 a few years